8 avril 2005
Renovations are in full swing at Gowan Brae. The main areas affected are the men's locker room, a new ladies locker room on the lower level adjacent to the men, the former power cart storage area under the deck and the main floor men's and ladies washrooms. Also, new floor coverings throughout the building are included. Work is progressing very well and we plan to have everything ready for the opening of the 2005 season.